Dear Christine and Bill, first of all a warm greeting and a hug, already having desire to rediscover as soon as possible your sympathy and friendship.
STEP TO WORK IMMEDIATELY.
Thursday i went to the meeting to the Civil Engineering of Arezzo, as you know, for the question seismic events.
Is Not going very well and now I will explain the reason. But in the meantime with Raffaello we have decided to resume work,We cannot do the floor for the new building until a new meeting with the Civil Engineering but we have a lot to do and therefore in this week, the site reopens.
The Civil Engineering, even with good reason, are unable to accept
A) that us being decommissioned a part of the wall in central brick (to get the fourth machine) and replace with the column of reinforced concrete.
B)the terrace is very large (five feet) and it is too long around the house. For the width of the five feet at the end can go, for the length there is some problem, as i say below.
We sought solutions that can go well with them, and below i explain.
A)as regards the first point (garage) are not prepared to yield,Indeed they would be very happy if the central wall of brick we close more, almost everything, because this would force the house. So I think that there are two possibilities:
1) LEAVE THE GARAGE AND ENTRANCE DOORS AS THEY ARE putting the four cars as they are designed in sheet 1 that you sent. We have taken the necessary measures with Raphael, we saw the car,Even if it is more difficult to enter, has more space mass as in the drawing that is not in the direction of the direction of travel.
2) OPEN TWO NEW DOORS OF NINE FEET ON THE RIGHT SIDE AND CLOSE THE TWO EXISTING leaving only a small door for the passage of a person (4 feet maximum). Also close the central wall always leaving the door of communication, as in the drawing 2a (plant),2B (front) and 2c (Prospectus right side)
B)For the terrace we say that there are no problems along the entire segment in which we continue to build the new floor while the see more dangerous in the area where there are already the two chambers, one of Bill, in front, but especially the one behind you. We will be able to save the whole terrace as we were in agreement,If ever there would oblige us to give up that piece behind, as it was in the project in which there was a new scale. Here we will have to decide us according what we will be able to achieve.
The floor must not be too heavy and therefore nothing concrete to steel or better yet in wood. What do you say if the floor above the garage and terrace, viewed from below, were wooden?
Returning to the garage, I understand that to you it was okay as it was in agreement, and as we had designed but in the way do not accept it and then we stop and we retard jobs.
hence it is necessary that you give me your favorite between the two projects described above, or leave the doors as now but not break down the wall, or make two doors on the side and close the current.
To make happy Bill, however, the promise that we will also have another "garage" in the cellar under kitchen and living room, as he had requested (i designed in sheet 2a) .
IT IS HOWEVER I DO YOU HAVE TO ANSWER SOON AS POSSIBLE. IMMEDIATELY, PRECISE THAT EVERYTHING DOES NOT INVOLVE NEW EXPENDITURE BUT RATHER SOME EXPENDITURE IN LESS, ESPECIALLY THE SOLUTION 1.
thanks and a hug, claudio